Verdaqa
Menu
ServicesSectorsToolsRegulationsInsightsContact

Sectors / Construction

Construction

Developers and contractors · Qatar and the GCC

Sustainability for developers, contractors and real estate

Buildings in the GCC are cooled for most of the year and built with carbon-heavy concrete and steel. We help project teams rate, measure and improve them.

What it is

The short version

Real estate and construction touch sustainability at every stage. Design decisions fix energy and water use for decades. Concrete and steel carry large embodied emissions. Sites employ large, mostly contractor workforces in extreme heat.

We support green building ratings under GSAS and LEED, embodied carbon estimates, operational emissions inventories for portfolios, ESG strategy for developers and owners, and safety culture programmes for contractors.

Our approach is early and practical. A rating target set at concept costs far less to achieve than one bolted on at tender.

Who needs it in the GCC

Who we work with

  • Developers and master planners.
  • Main contractors and design consultants.
  • Real estate owners and REITs with operating portfolios.
  • Government and semi-government project owners with sustainability targets.

Why now

GSAS, run by GORD, is the national rating system in Qatar and common in project briefs. Lenders and tenants increasingly ask for rated buildings and emissions data.

Owners preparing IFRS S2 disclosures need operational and, increasingly, embodied emissions for their assets.

What we deliver

Concrete outputs, not slides

Every engagement ends with files your team owns and can reuse next year.

  • GSAS and LEED credit strategy, design reviews and documentation
  • Embodied carbon estimates for structure and envelope
  • Portfolio GHG inventory including district cooling
  • ESG strategy and reporting for developers and owners
  • Construction site safety culture assessment
  • Climate risk screening for coastal and exposed assets

How we work

Four steps

  1. 01

    Listen

    We start with your deadlines: the report, the lender request, the tender or the EU customer. Then we review what data and systems you already have.

  2. 02

    Prioritise

    We rank obligations and risks by date and consequence, so effort goes where it matters first.

  3. 03

    Deliver

    We do the technical work with your teams: measurement, analysis, studies, drafting.

  4. 04

    Hand over

    You keep the workbooks, methods and plans. Next year runs on your systems, not ours.

Free tool

Scope 1-3 emissions calculator

Estimate operational emissions for a building or portfolio.

Open the tool

FAQ

Common questions

Is GSAS mandatory in Qatar?

GSAS requirements appear in many government projects and permitting conditions. Check the requirements for your project type and authority.

What is embodied carbon?

The emissions from making, transporting and installing building materials. Concrete and steel usually dominate.

How do we report emissions for a mixed-use portfolio?

Set the boundary by control, then collect electricity, cooling and fuel data by asset. Tenant energy is often Scope 3 for the owner.

Do you work with contractors directly?

Yes. Many construction stage requirements sit with the contractor, and they need practical support to meet them.

Tell us your deadline

Send us the report date, the lender request or the project brief. We reply within one working day with what applies and what it takes.

Contact us